Builders & developers

From dusty site to handover-ready.

New builds, renovations and extensions across West Cumbria, taken from last-trade-off-site to a finish that photographs and hands over clean. Builders, developers and homeowners.

Quick answer

Post-construction cleaning usually runs in two stages — a builders' cleanto clear dust and debris, then a sparkle clean that details every surface to handover standard. Scoped and priced per site; products, equipment and insurance included.

Newly installed kitchen detailed to handover standard after construction

How a site clean runs

01

Rough clean

Between trades: debris cleared, larger waste removed, surfaces made ready for the next phase.

02

Builders’ clean

Once trades are off site: dust removed top-down, residue and marks tackled, floors cleared and cleaned.

03

Sparkle clean

The finish: glass, fittings, sanitaryware, hardware and floors detailed to move-in, handover-ready standard.

Not every job needs all three stages — we scope what your site actually requires.

New bathroom cleaned of construction residue to a sparkle finish

The detail that gets missed

Fine dust, twice

Plaster and MDF dust resettles — we work top-down and return to it before sign-off.

Residue removal

Paint, silicone, adhesive and sticker marks off glass, tiles and hardware without scratching.

New-finish safe

The right method for each surface — no swirl marks on new glass or damage to fresh paint.

Flexible scheduling

We work around your programme and hit the handover date.

Straight answer

What is a post construction clean?

A post construction clean takes a new build, renovation or extension from a dusty site to a handover-ready finish. Cumbria Bright carries them out across West Cumbria for builders, developers and homeowners.

The work usually runs in stages. A rough clean between trades clears debris and larger waste. A builders' clean, once trades are off site, removes dust from the top down and tackles residue and marks. A sparkle clean then details glass, fittings, sanitaryware, hardware and floors to move-in standard. Not every site needs all three, so the team scopes what yours requires.

Fine plaster and MDF dust resettles, so the team returns to it before sign-off. Paint, silicone, adhesive and sticker marks are removed from glass, tiles and hardware without scratching new finishes. Each site is surveyed and quoted at a fixed price, with products, equipment and insurance included, and the work is scheduled around your programme and handover date.

Handover coming up?

Get your site cleaned to standard.

Send us the project and programme and we'll survey, scope the stages and quote a fixed price.